Digester Live — D-1, D-2, D-3, D-4

Real-time temperature, pH, level, gas flow, agitator status • Auto-filled shift log

Digester D-1 (CSTR-5000)

Running
Temperature
38.2 °C
Target: 38.0°C
pH
7.42
Optimal range
Level
87 %
4,350 m³
Gas Flow
1,240 Nm³/h
CH₄: 62.3%
Agitator A-101 Running • 1,480 rpm • 42 A
Heating Loop Supply 42°C / Return 36°C
Foam Level Normal (12%)
Head Pressure 1.2 bar

Digester D-2 (CSTR-5000)

Running
Temperature
37.8 °C
Target: 38.0°C
pH
7.31
Within range
Level
82 %
4,100 m³
Gas Flow
1,180 Nm³/h
CH₄: 61.8%
Agitator A-102 Running • 1,465 rpm • 44 A
Heating Loop Supply 44°C / Return 37°C
Foam Level Elevated (28%) — Monitor
Head Pressure 1.1 bar

Digester D-3 (CSTR-5000)

Running
Temperature
38.5 °C
Target: 38.0°C
pH
7.48
Optimal
Level
91 %
4,550 m³
Gas Flow
1,310 Nm³/h
CH₄: 63.1%
Agitator A-103 Running • 1,490 rpm • 41 A
Heating Loop Supply 40°C / Return 35°C
Foam Level Normal (8%)
Head Pressure 1.3 bar

Digester D-4 (CSTR-5000)

Running
Temperature
38.0 °C
On target
pH
7.38
Within range
Level
85 %
4,250 m³
Gas Flow
1,220 Nm³/h
CH₄: 62.0%
Agitator A-104 Running • 1,475 rpm • 43 A
Heating Loop Supply 41°C / Return 36°C
Foam Level Normal (15%)
Head Pressure 1.2 bar

24-Hour Trends (Gas Flow & Temperature)

Gas Flow (Nm³/h) Temp (°C) 1,400 1,200 1,000 800 35 36 37 38 39 40 00:00 04:00 08:00 12:00 16:00 20:00

Auto-Filled Shift Log — Morning Shift

Shift: 06:00–14:00 • Operator: Rajesh Kumar (GG-OP-0042) • Date: 18 Nov 2026
Time Parameter D-1 D-2 D-3 D-4 Remarks
06:00Shift Start----Handover from night shift
06:15Temp (°C)37.937.538.237.8All within range
06:15pH7.407.287.457.35-
06:15Gas Flow1,2101,1501,2801,190Nm³/h
08:00Feedstock In38 tonnes (Paddy straw)Supplier: GreenAgro Ltd
09:30Agitator CheckOKOKOKOKVibration normal
11:00Temp (°C)38.237.838.538.0D-2 heating increased
11:00pH7.427.317.487.38-
11:00Gas Flow1,2401,1801,3101,220Nm³/h
12:30Foam Check12%28%8%15%D-2 elevated — antifoam dosed
13:45Shift End----Log auto-saved, pending operator sign-off