Aerobot AI Assistant
Ask questions across all modules • Permission-aware • Cites sources • Read-only on plant control
security
Guardrails Active: Aerobot answers from your permitted data only. It cites sources for every claim. It can draft documents but never sends plant commands — all control actions require the Command Panel with PLC interlocks.
🤖
Hello! I'm Aerobot, your AI assistant for the Garuda Greens Platform. I can help you with:
- Plant operations: "Why was gas yield low yesterday?"
- Reports: "Draft the monthly lender letter"
- Summaries: "Summarise today's shift"
- Data lookup: "What's the H₂S trend for D-3 this week?"
Just now
Why was gas yield low yesterday?
09:12
RS
🤖
Gas yield dropped to 112 Nm³/tonne yesterday (vs 128 Nm³/tonne average) — a 12.5% decline. Key factors:
- Digester D-3 temperature excursion: Reached 42.5°C at 14:22 (limit: 40°C), inhibiting methanogens. Agitator ran at 100% but couldn't compensate.
- Feedstock quality: Two loads from M/s GreenFields Agri had moisture >65% (spec: <60%), diluting organic loading rate to 2.8 kg VS/m³/day.
- H₂S elevated: Scrubber outlet averaged 42 ppm (limit: 50 ppm), indicating partial bed saturation — may have affected upgrading efficiency.
09:12
Sources:
analytics Yield Analytics Dashboard — Daily KPI card (Gas Yield)
water_drop Digester Live Page — D-3 temperature log (14:22 alert)
local_shipping Feedstock Intake — Supplier M/s GreenFields Agri, loads #GF-2024-1187, #GF-2024-1188
science Gas Quality Log — H₂S scrubber outlet trend (13 Nov – 17 Nov)
Draft the monthly lender letter for November
09:15
RS
🤖
Here's a draft monthly lender letter for November 2024. I've pulled data from production, finance, and ESG modules.
09:15
Monthly Performance Report — November 2024
Garuda Greens CBG Plant 1 (Illustrative)
Prepared for: Lender Consortium
Date: 18 November 2024
1. PRODUCTION SUMMARY
• Gas Produced (MTD): 487,200 Nm³ (Target: 450,000 Nm³) — +8.3%
• CBG Sold (MTD): 356,400 kg (Target: 330,000 kg) — +8.0%
• Plant Uptime (MTD): 98.7% (Covenant: >95%) — Compliant
• Gas Yield (MTD): 126 Nm³/tonne (Benchmark: 135 Nm³/tonne)
2. FINANCIAL SUMMARY
• Revenue (MTD): ₹3.22 Cr (CBG: ₹2.84 Cr + Digestate: ₹38.2 L)
• Operating Cost (MTD): ₹1.97 Cr
• EBITDA (MTD): ₹1.25 Cr (Margin: 38.8%)
• Debt Service Coverage Ratio (Projected): 1.84x (Covenant: >1.25x)
3. SAFETY & COMPLIANCE
• Safety Events (MTD): 3 (All minor, zero LTIs)
• PPE Compliance: 94.2% (Target: >90%)
• Environmental Compliance: All parameters within limits
• PESO Licence Renewal: In progress (expiry 04 Jan 2025) — URGENT
4. ESG & CARBON (Greenleaf)
• CO₂e Avoided (MTD): 2,480 tCO₂e
• Carbon Credits Generated: 2,360 credits
• Water Recycling Rate: 87%
• Digestate Utilisation: 100% as bio-fertiliser
5. KEY RISKS & MITIGATION
• Risk: PESO licence expiry in 47 days
Mitigation: Renewal application submitted 10 Nov; follow-up with PESO weekly
• Risk: Gas yield below benchmark
Mitigation: Feedstock quality clauses enforced; D-3 temperature control review scheduled
6. CONSTRUCTION PROGRESS (Phase 2 — AeroBuild)
• Overall: 78% complete (On track for Mar 2025 commissioning)
• Next Milestone: Purification skid installation (12 days)
• Open Deviations: 3 (All non-critical, tracked in AeroBuild)
Next Report Due: 18 December 2024
Sources:
dashboard_customize MD Dashboard — Production & Financial KPIs
security PPE Events — Compliance dashboard
co2 Carbon Ledger — MRV data (MTD)
timeline AeroBuild Schedule Dashboard — Phase 2 progress
Summarise today's morning shift (06:00–14:00)
09:18
RS
🤖
Morning Shift Summary — 18 Nov 2024 (06:00–14:00)
- Attendance: 187/203 present (12 on leave, 4 unplanned absent)
- Feedstock: 142 tonnes received (8 trucks, 12 tractor-trolleys); 2 quality flags (moisture >60%)
- Digesters: All 4 running. D-3 temp alert at 14:22 (42.5°C) — acknowledged by operator S. Patil, normalised by 14:45
- Gas Production: 12,400 Nm³ (06:00–14:00); on track for daily target
- Compressor: Compressor 2 started remotely at 13:05 by Plant Manager (interlocks satisfied)
- Safety: 1 PPE event — helmet missing at compressor house (zone C-H-03), worker counselled
- Dispatch: 2 OMC tankers filled (18,200 kg total); quality certificates auto-generated
- Maintenance: WO-2026-1189 created for Agitator A-102 vibration trend
09:18
Sources:
schedule Shift Roster — Attendance (06:00 punch-in)
local_shipping Feedstock Intake — Today's deliveries log
water_drop Digester Live — D-3 temperature alert log
speed Meter Readings — Gas flow totals
security PPE Events — Zone C-H-03 event (14:18)
inventory_2 Sales & Dispatch — Tanker fill records